Upgrading
1.4.0
1.4.0 has no migration steps, but one behaviour change can affect scripts and integrations.
At most one link between two issues
xpo link, xpo link --json and the MCP link tool now fail on a pair that is already linked with a different kind, unless you pass --overwrite (MCP and JSON: "overwrite": true) to replace the existing link. add and update reject a links set with two entries for the same issue.
Pairs recorded with more than one link before 1.4.0 keep working until a write changes them. See One link per pair.
Refresh the agent instructions
The skill text now explains the one-link rule. Run xpo init or xpo doctor --fix in each project to pick it up. xpo doctor reports the integrations as out of date until you do.